Discover, prove, ship, operate
A plain four-phase method for AI and cloud work. Each phase has named deliverables and ends in a decision you make on evidence. Once each phase is paid for, the code, data and documentation are yours.
Four phases, each with a clear output
You can stop after any phase and keep everything you have paid for. Nothing moves forward until you approve it.
-
Discover (1–2 weeks)
We map the workflow, the data and the systems, then rank use cases by value and feasibility. You receive an opportunity map, a data readiness review, an architecture sketch, an ROI model and a roadmap. This is our Discovery Sprint.
-
Prove (4–8 weeks)
We build one focused solution on your real data, with success metrics agreed before we start. You see a working demo every week and an evaluation report at the end. This is our Pilot Project.
-
Ship
We harden what worked: integrations, access controls, monitoring, cost limits, fallbacks and human approval steps. It goes live in stages, starting with a small share of real traffic.
-
Operate
We watch quality, cost and incidents after launch, run evaluations on every change and improve the system with your team. Or we hand it over fully, with runbooks and training.
Every phase ends with a go/no-go decision
AI projects fail quietly when nobody is asked to decide. We build the decision into the plan. At the end of each phase we meet with your sponsor and review the evidence against criteria written down at the start.
Gate 1: after Discover
Is there a use case worth proving? We check that the problem is costly enough, that the data exists and can be used, that the risk is acceptable and that someone on your side owns the outcome. If the answer is no, we say so and the roadmap is still yours.
Gate 2: after Prove
Did the pilot hit the agreed metrics on real data? We look at the primary metric (for example, share of tickets resolved without a handoff, or extraction accuracy on a held-out set), the guardrail metrics (errors, escalations, cost per task, latency) and what users actually said. The options are to scale, to adjust and re-test, or to stop.
Gate 3: before full rollout
Is the system safe to run at full volume? We confirm the security review is closed, monitoring and alerts work, the rollback path has been tested, and your team knows what to do when something goes wrong.
Stopping is a valid result. A pilot that shows an idea does not work saves you the cost of building it at full scale. See our engagement models for how each phase is scoped.
Who works on your project and how we test it
Team roles
- Engagement lead: your single point of contact. Owns scope, the plan, the weekly demo and the gate reviews.
- AI engineers: build the agents, retrieval, prompts, tools and evaluation suites.
- Software and integration engineers: connect the system to your CRM, ERP, helpdesk, databases and APIs.
- Cloud and DevOps engineer: infrastructure as code, CI/CD, monitoring, cost controls and deployment.
- Security reviewer: threat model, access design and AI-specific testing before each release.
From your side we ask for a business owner who can make decisions, a technical contact for access and systems, and a few people who do the work today and can judge the output.
How we test quality: evaluations
A good demo is not proof. From the first week we build an evaluation set: real examples from your work, with the correct answer or action for each, agreed with your subject-matter experts. Every change to a prompt, model, tool or data source is run against this set before it ships, so quality is measured instead of guessed.
- Task-level checks: was the answer correct, complete and grounded in your sources?
- Behavior checks: did the agent call the right tool, respect permissions and escalate when it should?
- Adversarial checks: does it resist prompt injection, data leakage and off-topic misuse?
- Operational checks: cost per task, latency and failure rate under realistic load.
After launch the same suite runs on sampled production traffic, so drift shows up in a report rather than in a customer complaint.
Security from day one, and a handover with no lock-in
Security from day one
Security is part of the design, not a final checklist. In the Discover phase we write a short threat model and decide where data may go. During the build we apply least-privilege access for every agent and service, keep secrets in a managed vault, log every tool call, and test against the OWASP Top 10 for LLM Applications (2025). Actions that are irreversible, financial, customer-facing or legal require human approval until evidence shows otherwise. Details are on our Trust & Security page.
Handover you can run without us
- Full code ownership: the source code, prompts, evaluation sets and infrastructure code live in your repositories, and ownership transfers to you under the project agreement.
- Runbooks: how to deploy, roll back, rotate keys, pause an agent and respond to common incidents.
- Documentation: architecture, data flows, design decisions and their reasons, and known limits.
- Training: working sessions with your engineers and the people who will supervise the system.
- No lock-in: we design so that models and providers can be swapped, and the system runs in your accounts. You can continue with us, with another partner or on your own.
Where AI projects stall and how we avoid it
In June 2025 Gartner predicted that over 40% of agentic AI projects will be canceled by the end of 2027, citing escalating costs, unclear business value and inadequate risk controls. These are the failure modes we see most often, and what our method does about each.
| Failure mode | Our counter-measure |
|---|---|
| No clear business value. The project starts from the technology, not from a costly problem. | Discover ranks use cases by measurable value and names an owner. No use case moves to a pilot without a baseline and a target. |
| Success was never defined. The pilot ends in a nice demo and nobody can say if it worked. | Success metrics and guardrail metrics are written down before the build. The pilot ends in a go/no-go decision, not a demo. |
| Data is not ready. Documents are scattered, outdated or not allowed to leave a system. | A data readiness review in week one. We fix access and quality issues early or narrow the scope to data that works. |
| Costs grow unnoticed. Token use, retries and long agent loops add up at scale. | Cost per task is an evaluation metric from the start. We set budgets, limits and model routing, and project run costs before rollout. |
| Weak risk controls. Agents get broad access and no one can explain what they did. | Own identity per agent, least-privilege access, human approval for high-impact actions, full audit logs and a kill switch. |
| Nobody adopts it. The people doing the work were not involved and route around the tool. | Frontline users help build the evaluation set, see weekly demos and shape the handoff points between agent and human. |
The same thinking runs through our Discovery Sprint and Pilot Project.
A typical week on a project
The method above describes phases and gates. Inside each phase, the work follows a steady weekly rhythm, so you always know when to expect something and when we need something from you. The exact days are agreed at the kickoff; the shape stays the same.
| When | What happens | Your involvement |
|---|---|---|
| Start of week | Plan the week's work against the milestone, update the risk register | Technical contact, optional |
| Through the week | Build, review, run evaluations, answer questions in the shared channel | Quick answers to questions as they come up |
| Demo day | Live or recorded demo of working software with current evaluation scores | Sponsor, technical contact and subject experts |
| End of week | Written update: summary, done, metrics, next, decisions needed, risks | Read it and answer the decisions listed |
The format of the written update is shown on Your first 30 days. If something important changes mid-week, we tell you then rather than waiting for the update.
How we plan and handle unknowns
We quote fixed scope, which only works if the scope is clear. AI projects always contain some unknowns: whether a model can read a particular document type, whether an API exposes the field we need, how messy the data really is. We deal with these explicitly instead of hiding them in padding.
- Name the unknowns: the proposal lists the assumptions we are least sure of.
- Test them early: the riskiest assumptions are checked in the first days with small, time-boxed investigations on real data.
- Decide on the result: if an assumption turns out wrong, we bring options to your sponsor through a change request, such as narrowing scope or swapping a feature, rather than quietly absorbing or extending.
- Plan in milestones: each milestone has a clear output and acceptance check, so progress is visible and problems surface early.
What "done" means for a release
A feature is not done when it works on an engineer's machine. Before anything reaches your users, it has to meet a definition of done that both teams agree at the start. Ours usually includes:
- Code reviewed by a second engineer and merged through your pipeline.
- Automated tests passing, and the evaluation suite at or above the agreed thresholds, including critical cases.
- Security checks passing: dependency and secret scanning, and AI-specific tests where the change affects prompts, tools or data access.
- Logging, metrics and alerts in place for the new behavior.
- Documentation and the runbook updated, and the decision log updated if a decision was made.
- Your product owner has seen it and accepted it against the milestone criteria.
Working inside your tools
We adapt to the tools your team already uses rather than asking you to adopt ours. Code goes in your repositories on GitHub, GitLab, Bitbucket or Azure DevOps. Tasks live in your tracker, such as Jira, Linear or Azure Boards, or in a simple shared board if you do not have one. Conversation happens in your Slack, Microsoft Teams or email. Documents and the decision log sit in your wiki or repository.
If our engineers use AI coding assistants on your code, it is only with your agreement on which tools and under which terms, and their output goes through the same review, tests and security checks as any other code. The same rule applies to any AI tool used in your environment, as described in our cloud access policy.
Documentation written as we go
Documentation written in the final week of a project is usually incomplete, because the reasons behind early decisions have already been forgotten. We write it alongside the work instead. The architecture document starts in the Discover phase and is updated whenever the design changes. The decision log gets an entry the day a decision is made. The runbook is drafted at the first deployment to a shared environment and tested whenever we practice a rollback or pause an agent.
By the time of handover, the documents have been used by our own engineers for weeks, so the gaps have already been found and filled. Your team reviews them at each milestone, not only at the end.
Disagreements and escalation
Good projects have disagreements: about a design, a priority or whether a result is good enough. We prefer to surface them early and settle them on evidence. Technical disagreements are written up as a short design record with the options and trade-offs, and your technical contact decides or escalates. Priority and scope disagreements go to your sponsor. If you are unhappy with how the project is going, raise it with your engagement lead first; if that does not resolve it, use the escalation route agreed at the kickoff, which names who at Gepton to contact next.
For how engagements are contracted, see engagement models; for our principles on risk, see Responsible AI.
Questions about our method
Something else? Send us your question and an engineer replies.
Do we have to start with a Discovery Sprint?
No. If you already know the use case, have the data and have agreed success metrics, we can start with a Pilot Project. Most teams benefit from Discovery because it confirms the data and the business case before any build spend. We will tell you honestly on the first call which start fits.
How long does it take to get something live?
A Discovery Sprint takes one to two weeks and a Pilot Project four to eight weeks. The Ship phase depends on integrations, security review and how gradually you want to roll out. We give you a dated plan at the end of each gate, not a single estimate at the start.
What happens if the pilot misses its targets?
We review why at the gate. Sometimes a scope change or better data closes the gap and a short re-test is worth it. Sometimes the right answer is to stop. Either way you keep the code, the evaluation results and the lessons learned.
Who owns the code and the prompts?
You do. Code, prompts, evaluation sets and infrastructure code live in your repositories, and intellectual property transfers to you under the project agreement. We keep only general know-how.
Does this method apply to cloud and DevOps work too?
Yes. For Cloud & DevOps the Discover phase is usually a Kubernetes and DevOps assessment, and the Prove phase is a first slice of the target platform, pipeline or migration. The gates, handover and no-lock-in principles are the same.
How do you keep us informed?
A weekly demo of working software, a short written update with progress, risks and decisions needed, and a shared tracker. Your engagement lead is your single point of contact.
Can our team join your daily stand-ups?
Yes. Many clients have their technical contact or engineers join the team's daily stand-up, especially when they will own the system later. If daily attendance is too much, the weekly demo and written update give a complete picture, and the shared channel is always open for questions.
How do you handle unknowns in a fixed-scope project?
We list the least certain assumptions in the proposal and test them in the first days with small, time-boxed investigations on real data. If one turns out wrong, we bring options to your sponsor as a change request, such as narrowing scope or swapping a feature, instead of quietly extending the timeline.
Do your engineers use AI coding assistants on our code?
Only with your agreement on which tools are used and under what terms, including whether any of your code may be sent to an outside service. Anything produced with such tools goes through the same code review, tests and security scanning as the rest of the work.
What if we disagree with a technical decision your team makes?
Say so. Technical choices are written up as design records with the options and trade-offs, and your technical contact can challenge or override them. If the disagreement affects scope, cost or risk, your sponsor decides. The outcome and its reasons go into the decision log.