A responsibility matrix, agreed before the first ticket
Most friction in managed services comes from unclear boundaries: an alert fires and each side assumes the other is handling it. We write a responsibility matrix during onboarding and review it whenever the scope changes. A simplified example of how it often looks, which we adapt to each client:
| Activity | Gepton | Your team |
| Kubernetes and add-on upgrades | Plans, tests, executes | Approves window, validates applications |
| Node and base image patching | Executes on the agreed calendar | Informed; approves exceptions |
| Application code changes and releases | Supports pipelines | Owns code and release decisions |
| Platform alerts (cluster, nodes, pipelines, backups) | First responder within coverage hours | Escalation for application impact |
| Application alerts | Triage and route, if in scope | Owns resolution |
| Backup restore tests | Runs and records | Confirms application data is usable |
| Access requests and reviews | Implements through code | Approves |
| Cost review | Prepares findings | Decides actions |
Change classes: what needs approval and what does not
Asking for approval on every routine patch slows everything down; making risky changes without approval erodes trust. We use three change classes, defined with you during onboarding:
- Standard changes are routine, low-risk and pre-approved as a category, such as applying a patch release of a cluster add-on that passed in non-production, or rotating node images within an agreed window. They are logged and reported, not individually approved.
- Normal changes need approval from your named owner, such as a Kubernetes minor version upgrade, a network change or a new add-on. They come with a plan, a test result from non-production and a rollback step.
- Emergency changes address an active incident or a critical vulnerability being exploited. They follow a shortened approval path agreed in advance, and are reviewed afterwards.
Every change, whatever its class, goes through Git and your pipelines, so the record is the same.
Severity levels and how tickets flow
Requests arrive through your preferred channel: a ticketing system, a shared Slack or Microsoft Teams channel, or alerts routed through PagerDuty or a similar tool. Each is classified by severity using definitions written into the scope, for example: a production outage or data risk; a degraded production service or a failed backup; a non-production problem or a non-urgent request; and planned work. Severity decides who is notified, whether your on-call is pulled in and how updates are given. We review the classification in the monthly report, because a pattern of misclassified tickets usually signals a gap in monitoring or documentation.
Keeping knowledge in your hands
A managed service should make you less dependent on individuals, including ours. Everything we learn goes into places you own: architecture notes and runbooks in your repository or wiki, decisions recorded as short decision records, incident reports in your incident tool, and changes in Git history. When an engineer on our side rotates, the next one starts from the same documentation your team can read. During quarterly reviews we check which runbooks were used, which were missing and which need updating.
How we use AI in day-to-day operations
Our operations work is AI-assisted where it helps and human-controlled where it matters. Agents with read-only access gather context when an alert fires: recent deploys, pod events, related logs and similar past incidents, and post a summary for the engineer on duty. AI helps draft upgrade notes from release changelogs, summarize long pipeline logs and prepare the first draft of incident reports and monthly summaries. Any change to your systems is still made by a named engineer through a reviewed pull request. If you prefer that no AI tools touch your environment or data, that is written into the scope and respected. The same approach, built for your own team, is available through AI Agents for DevOps & SRE and our Incident Investigator.
Quarterly reviews and a forward plan
Monthly reports cover what happened. Once a quarter we step back with your engineering lead to look ahead: upcoming end-of-support dates for Kubernetes versions, add-ons and base images; capacity and cost trends; recurring incidents that need an engineering fix rather than another response; and any change in your product plans that affects the platform, such as a new region, a new customer's security requirements or an AI feature needing GPUs. The output is a short, prioritized plan for the next quarter, separating work covered by the managed scope from projects that need their own scope.
The quarterly review is also where the scope itself is adjusted. A new cluster, a second cloud, wider coverage hours or a component your team has taken back in-house changes the work, and the responsibility matrix, runbooks and reporting are updated together so the written scope always matches what actually happens day to day.
To see how close your clusters are to their support deadlines today, try the Kubernetes upgrade checker. If you are not yet sure what to hand over, the Kubernetes & DevOps Assessment produces the inventory and risk list that a managed scope is built on.